Dubai’s Roads and Transport Authority (RTA) has officially awarded two major contracts for the Al Meydan Street Development Project. This strategic infrastructure initiative, valued at Dhs1.161 billion, is designed to significantly enhance the efficiency and connectivity of Dubai’s primary road network. By upgrading key intersections and expanding road capacity, the project aims to support the emirate’s rapid urban and economic growth while providing sustainable, long-term traffic solutions.
Project Scope and Engineering Specifications
The development project is extensive, involving the construction of 3,700 metres of new bridges and 17 kilometres of road upgrades. Additionally, the project incorporates new cycling tracks, which will improve connectivity with the existing city-wide cycling network. To ensure efficient delivery and manage the complexity of the engineering works, the project has been split into two distinct contracts. This strategic division is intended to accelerate implementation, allowing the RTA to realize traffic and development benefits more quickly while ensuring the project remains integrated with the broader road network.
Strategic Importance and Traffic Improvements
- The project serves residential and development areas housing a combined population exceeding 500,000 residents.
- Al Meydan Street acts as a critical parallel corridor to Sheikh Mohammed Bin Zayed Road and Al Khail Road, providing vital relief to these high-traffic arteries.
- The infrastructure upgrades will increase the capacity of north-south traffic corridors by 18%.
- Travel times from Al Manama Street and Dubai-Al Ain Road to Umm Suqeim Street are expected to drop from 30 minutes to just 10 minutes, representing a 66% improvement in mobility.
Leadership Vision and Future Objectives
Mattar Al Tayer, Director-General and Chairman of the Board of Executive Directors of the RTA, emphasized that the project is guided by the leadership’s vision to prioritize infrastructure investment as a fundamental pillar of development. According to Al Tayer, the RTA maintains a proactive approach to planning, ensuring that the road network keeps pace with the city’s population and economic expansion. This initiative is directly aligned with the objectives of the Dubai 2040 Urban Master Plan and the Dubai Economic Agenda D33, both of which aim to reinforce Dubai’s status as a premier global city for living, working, and investment.
Contract Details and Timeline
The first contract focuses on the development of Al Meydan Street from its intersection with Latifa Bint Hamdan Street to Umm Suqeim Street. This scope also includes the development of Al Marabea’ Street, stretching from Dubai Hills to Sheikh Mohammed Bin Zayed Road. A major component of this contract is the construction of an interchange featuring bridges that extend 1,600 metres, which will provide a combined capacity of 14,400 vehicles per hour in both directions. The entire project is scheduled for completion by the end of 2028.
By strengthening connectivity across the main road network and providing alternative routes, the project will improve traffic distribution and increase mobility efficiency between key residential and development areas. The RTA continues to focus on delivering sustainable solutions that support current urban expansion while preparing the city for future growth. The project serves as a testament to the authority’s commitment to enhancing the quality of life for all residents and visitors in Dubai through world-class infrastructure.

